Skip to content
For aircon and HVAC technicians

Get booked for the service on every aircon you install

Tag each split, cassette and ducted unit with a QR service passport. Customers get service reminders by email, scan the tag and book you, not the next company that drops flyers in the complex.

See a live passport
C

Coolfront Aircon

Installed by Coolfront Aircon

Split aircon

LG Dual Inverter 12 000 BTU

Overdue
Capacity
12 000 BTU · R32
Location
Main bedroom
Installed
9 Apr 2026
Warranty to
9 Apr 2029

Next service

9 Oct 2026

Book a service
Call
WhatsApp

Service history

Installation

9 Apr 2026

IP-8FCZ-35

What you'll tag

  • Wall-mounted split units
  • Inverter multi-splits
  • Ceiling cassettes
  • Under-ceiling units
  • Ducted systems
  • Condensate pumps
  • Extractor fans

Sound familiar?

Where aircon & hvac lose the repeat work

Services get skipped until something fails

Nobody thinks about the aircon until it's a heatwave and it's blowing warm air. By then they'll book whoever can come today.

Warranty claims can hinge on service records

Some manufacturers ask for proof of regular servicing before honouring a claim. If the homeowner can't show it, the warranty conversation gets awkward.

Every visit starts with finding the details

Model, refrigerant type, pipe run, last service date. Without a record on the unit, you're guessing before you've opened the cover.

How the loop works for you

Say you install two splits in April and set a six-month service interval. In September the homeowner gets an email that the service is due, scans the tag on the bedroom unit and sends a booking request. It's on your Today dashboard before the first hot weekend, and the unit's history is on the passport when you arrive.

On every passport

What InstallPass records

  • Unit type, brand, model and BTU capacity, read from the rating-plate photo
  • Serial number
  • Install date and room or location
  • Installer and manufacturer warranty periods
  • Service interval and next service date
  • Install notes: refrigerant type, pipe run length, drain route
  • Photos of the indoor unit, outdoor unit and brackets
  • Commissioning sheet and compliance documents

Keep on file

Documents worth attaching

  • Commissioning sheet: refrigerant type, charge, pressures and temperatures
  • SAQCC Gas registration details for the refrigerant practitioner, where applicable
  • Electrical CoC for a new dedicated circuit, where applicable
  • Manufacturer warranty registration
  • Service sheets for each maintenance visit

Requirements vary by installation, municipality and manufacturer, so check what applies to each job.

Service touchpoints

Reminders that match how your units are serviced

Set a service interval per unit and InstallPass sends the reminders. Typical starting points:

Filter clean

Every 3 months

Homeowners can often do this themselves. Dusty or high-use rooms need it more often.

Full service: coils, drain and performance check

Every 6–12 months

A typical range for homes. Coastal, commercial and heavy-use sites often need more.

Condensate drain and pump check

Every 12 months

Check sooner if there are leaks or water marks below the unit.

Warranty-end check

Before the warranty ends

InstallPass emails the customer automatically when the warranty ends within 60 days.

FAQ

InstallPass for aircon & hvac: questions

In their words

What installers say about it

Read more

The same story in every trade: a tag that stays on the unit is what brings the next job back to the person who fitted it, years after the invoice was paid.

Example
Three geysers I fitted in 2023 came back to me this winter instead of going to whoever was cheapest on Google. The tag was still on the pipe and they scanned it.
Thabo MokoenaOwner, Mokoena Plumbing Works · Randburg
Example
The rating plate photo doing the typing is the part my guys actually use. Before this, half the job cards came back with the serial number missing.
Riaan van NiekerkOperations manager, Van Niekerk Solar · Centurion
Example
A customer phoned about a warranty claim from two years ago. I had the certificate of compliance and the install date on screen before she finished the sentence.
Naledi DlaminiOwner, Dlamini Electrical · Durban North

Start tagging wall-mounted split units today

Start your free trial and tag your first unit today. Fourteen days of every Pro feature, on real installs. If the bookings do not come back, you have lost nothing but an afternoon.

Book a demo

No card needed · 10 free self-print tags